For TM ROCO, on behalf of Lantis, we supplied a
Fully mobile external wall formwork for the Oosterweel Link’s canal tunnels in Antwerp. Thanks to its anchoring in the floor, TM ROCO can cast the external walls without the need for centre pins.
𝗗𝗲 𝗸𝗿𝗮𝗰𝗵𝘁 𝘃𝗮𝗻 𝗱𝗲𝘇𝗲 𝗼𝗽𝗹𝗼𝘀𝘀𝗶𝗻𝗴:
· Fewer lifting movements and less physical strain
· Faster and easier positioning
· Time saved on the building site
· Fully mobile