The façade scaffolding, with suspended working platforms, at the Beneluxlaan project in Wessels Rijssen has been specially adapted to the challenging shape of the building. This was necessary because the building has sloping floor edges on one side. The use of façade scaffolding allows the façade elements to be installed immediately after the tunnels have been stripped and hoisted away. This not only saves time, but also increases efficiency and safety on the construction site.