Hendriks supplies heavy-duty and quickly movable steel table formwork for tunnel construction

Stalen tafels van Hendriks Formwork Solutions in gebruik bij tunnelbouwproject De Oosterweelverbinding in Antwerpen.

For the impressive infrastructure project 'De Oosterweelverbinding' (commissioned by Lantis), TM COTU is responsible for the construction of the Scheldt tunnel, the access tunnels and the connecting roads on the left and right banks near Antwerp. On the left bank, TM COTU is applying various steel formwork solutions designed and supplied by Hendriks for the construction of the concrete tunnel structures.

In order to pour the heavy concrete roofs of these tunnels, 20-metre-long tables with a load capacity of up to 4 tonnes/m² are used, among other things. In combination with our specially designed hydraulic lifting system, which ensures smooth and fast movement to the next pouring position, these tables contribute maximally to efficiency and safety on the construction site.

Share

Curious about our solution for your project?

Our specialists are happy to help you.

Request a quote Make an appointment

More news & insights