Did you know that during the tunnel cycle, you can widen and narrow the formwork both mechanically and hydraulically, with a range of 1.20 metres? A good example of this is the Beneluxlaan project by Wessels Rijssen, where this process is successfully carried out twice per floor by the pouring team.