For the construction of 85 homes in Nijmegen, Husovic Bouw, commissioned by Reinbouw BV, is using our wall formwork from the basement right up to the top floor.
The residential tower comprises eight storeys, including a basement level, which houses one of the most distinctive elements of the project. The corners of the walls here had to be cast in a single pour. To achieve this, we developed special
bespoke corner formwork.
𝗩𝗼𝗼𝗿 𝗱𝗶𝘁 𝗽𝗿𝗼𝗷𝗲𝗰𝘁 𝘃𝗲𝗿𝘇𝗼𝗿𝗴𝗲𝗻 𝘄𝗶𝗷:
▪️ Steel wall formwork
▪️ Corner formwork for the basement
▪️ Accessories for concrete formwork
▪️ Lift shaft decking
▪️ End-wall formwork
From engineering and planning to assembly and dismantling: we take care of the entire process. We contribute ideas right from the preparation stage, carry out on-site assembly and remain involved throughout the project. In this way, we not only provide the right systems, but also the support needed to ensure the project runs smoothly.