Moulds for prestressed bridge girders
Hendriks supplied two specialised moulds for the production of approximately 850 prestressed bridge girders for the expansion of the metro network in Cairo, a project commissioned by Spanbeton. The customised solution, consisting of two steel moulds, each 60 metres long, makes it possible to produce four bridge sections in a single production cycle.