Tunnel formwork
We supplied steel tunnel formwork for the construction of the TUI Hotel Santa Martha on Curaçao on behalf of W. Tieleman B.V. Our engineers took care of the assembly on site. Thanks to this formwork, the walls and floors could be poured in a single operation, ensuring a fast and efficient construction method. A valuable contribution to the realisation of this top hotel on the island.