For efficient pouring of high, smooth walls at tunnel entrances and motorway ramps, this solution offers maximum control and minimal crane requirements.
Every day counts in infrastructure projects. This ramp formwork combines speed with high-quality finish and reduces your crane costs at the same time. Thanks to the self-propelled system and fully hydraulic operation, you can position the formwork easily and without delay. The formwork is height-adjustable and delivers consistent results in a cycle of just 4 to 5 days. Hendriks Formwork Solutions thinks along with you in every detail (from design to implementation) for solutions that really make a difference.
Walls poured within 4 to 5 days
Adjustable height for varying situations
Self-propelled or manoeuvrable with a winch
Fewer crane hours and manpower required
Sleek wall finishes for every project
Specifications
Fully hydraulically driven
Self-propelled with hydraulic wheel sets or winch
Integrated portal and cleaning trolley
Suitable for smooth high walls with short setting cycles (4–5 days)
Designed for maximum productivity and minimum crane costs